Big Tech

POSCO Group Completes Lithium Hydroxide Plant, Strengthens Battery Material Supply Chain

IT타임스 2024. 11. 30. 05:05

(From left) Kang Seok-hoon, Chairman of the Korea Development Bank, Steve Scudamore, Independent Director of Philbar Minerals, Jeff Robinson, Ambassador of Australia to Korea, Jang In-hwa, Chairman of POSCO Group, Prime Minister Han Deok-soo, Kim Young-rok, Governor of Jeollanam-do Province, Kwon Hyang-yup, Member of Parliament, Lee Seung-ryul, Head of Industrial Policy at the Ministry of Trade, Industry and Energy (Credit: POSCO)



On November 29, POSCO Pilbara Lithium Solutions, a subsidiary of POSCO Group, announced the completion of its second lithium hydroxide plant in the Yulchon Industrial Complex, South Jeollanam-do. This achievement comes just one year after the completion of the first plant, establishing a total annual production capacity of 43,000 tons—enough to manufacture approximately one million electric vehicles.

IT Times: https://www.ittimes.com/news/articleView.html?idxno=56292

 

POSCO Group Completes Lithium Hydroxide Plant, Strengthens Battery Material Supply Chain - IT타임스

POSCO Group has solidified its position in the global battery industry by completing a system capable of producing 43,000 tons of lithium hydroxide annually, a critical material for secondary batte...

www.ittimes.com